Open

-     Detail Design Phase HVAC
    >    Prepare Standard Drawing
    >    Prepare Engineering Specification
    >    Prepare Cooling Load Calculation
    >    Prepare HVAC layout and HVAC system flow schematic
    >    Prepare HVAC equipment schedule and/or datasheet
    >    Prepare preliminary I/O list as reference for Sub-Contractor
    >    Prepare preliminary control narrative
    >    Prepare HVAC work supply & install requisition, BoQ, and Technical Bid from potential Sub-Contractor
    >    Review Shop Drawing and Document from Sub-Contractor
-     Construction Phase HVAC
    >    Monitor HVAC work at site
    >    Prepare necessary action for HVAC issue as Field Engineer
    >    Monitor HVAC inspection
    >    Monitor HVAC pre-commissioning and commissioning
    >    Prepare HVAC “As-Built” Drawing

Category Engineering & Manufacturing
Subcategory Industrial design
What do you need? New design from scratch
Is this a project or a position? Project
Required availability As needed

Delivery term: Not specified

Skills needed