Evaluating bids

Hydro electric dam

Published on the January 27, 2019 in IT & Programming

About this project

Open

This is hydro electric dam project using c programme .it is running in pic18f4520 processor.The working is water level in the dam reaches above a minimum allowable level,water gate of the dam will automatically open to release the excess water.when the water level drops down to the safe level,the water gate will start to close.A siren together with lights will be on whenever the water gate is opening or closing to warn the people around the vicinity.The design should allow the user to set how wide the water gate should be opened depending on how fast the water level is rising in the dam.a safety override feature should be include in your design, so that user can open or close water gate manually.

Category IT & Programming
Subcategory Other
Project size Medium
Is this a project or a position? Project
I currently have I have the design
Required availability As needed
API Integrations Other (Other APIs)

Delivery term: Not specified

Skills needed

Other projects posted by J.