Evaluating bids

Project execution plan for road construction

Published on the April 19, 2019 in Engineering & Manufacturing

About this project

Open

I am working in construction establishment and we will submit quotation for road construction in rural area the scope is earthwork without asphalting.
The length of road is 25 km and The width is 10m plus tow side slopes
It needs stripping top soil and backfilling two layers subgrade and subbase. Of course it needs grading, watering and compaction.
The subgrade and subbase material will be prepared by excavating borrow pit and then screening the material.
Nearest poin Distance from road to borrow pit is 10 km.

Required is project execution plan

Category Engineering & Manufacturing
Subcategory Other
Project size Medium
Is this a project or a position? Project
Required availability As needed

Delivery term: Not specified

Skills needed