Evaluando propuestas

Hvac - Me Engineering

Publicado el 25 Septiembre, 2019 en Ingeniería y Arquitectura

Sobre este proyecto

Abierto

-     Detail Design Phase HVAC
    >    Prepare Standard Drawing
    >    Prepare Engineering Specification
    >    Prepare Cooling Load Calculation
    >    Prepare HVAC layout and HVAC system flow schematic
    >    Prepare HVAC equipment schedule and/or datasheet
    >    Prepare preliminary I/O list as reference for Sub-Contractor
    >    Prepare preliminary control narrative
    >    Prepare HVAC work supply & install requisition, BoQ, and Technical Bid from potential Sub-Contractor
    >    Review Shop Drawing and Document from Sub-Contractor
-     Construction Phase HVAC
    >    Monitor HVAC work at site
    >    Prepare necessary action for HVAC issue as Field Engineer
    >    Monitor HVAC inspection
    >    Monitor HVAC pre-commissioning and commissioning
    >    Prepare HVAC “As-Built” Drawing

Categoría Ingeniería y Arquitectura
Subcategoría Diseño industrial
¿Qué necesitas? Crear un diseño desde cero
¿Es un proyecto o una posición? Un proyecto
Disponibilidad requerida Según se necesite

Plazo de Entrega: No definido

Habilidades necesarias